  • Ajo: Provided study of mine water system for private purchase including analysis of arsenic treatment system
  • Alpine: AAWS, utility and water supply analysis at the Alpine Country Club
  • Arizona City: AAWS
  • Arizona Gateway: Production well drilling, aquifer testing, post construction water system permitting (ATC, AOC)
  • Benson: AAWS (multiple projects), Expert witness in GW/SW hearings in General Adjudication of Gila River System and Source & Proposed listing of endangered species
  • Buckeye: Production well drilling, exploratory well drilling, Recovery Well Permitting, aquifer test, AAWS, CAWS, water master plan, storage tank, booster station, water line installation, technical review of proposed Town well standards, water master plan, technical review of the brine stream disposal alternatives generated from membrane water treatment.
  • Bullhead City: Production well drilling, exploratory well drilling, aquifer testing, geophysical surveys, water distribution
  • Casa Grande: AAWS, Aquifer testing
  • Cave Creek/Carefree: Soil Borings, Golf Course ADWR compliance assistance
  • Cerro Montoso: Hydrogeologic Analysis, Well Drilling Oversight
  • Coolidge: AWS, Water and Wastewater Master Plan, Production Wells
  • East Valley: AAWS, Golf Course, Phase I
  • Flagstaff: Provided staff to serve as the Water Resources Manager during transition period
  • Gila Bend: Panda – Power Plant Septic, this was an alternative disposal system employing reuse of the effluent.
  • Gillespie Dam: Kinerk – Flooding/erosion litigation support, AAWS (ski lake community)
  • Goodyear: Production well drilling, aquifer test, DAWS, Recovery Well Permitting, recharge facility: Hydro investigation, permitting, design, CM, prepared reuse master plan, prepared pretreatment regulations that were promulgated, and as individuals we also designed the 157th avenue WWTP.
  • Graham County: Production well drilling, aquifer test, design services for new well
  • Hassayampa River Basin: AAWS, CAWS,aquifer testing, RW permitting
  • Florence: Production well drilling, aquifer testing, compliance sampling, DAWS & Omega Monterra, we are also doing a project to equip well 3. Provided a comprehensive water master plan, and a comprehensive wastewater master plan. Provided remedial design changes to the wastewater treatment plant to attain compliance while new plant was under construction.
  • Kingman: Assisted in establishment of co-op water company, assisted in development of an existing well for selling water to water haulers
  • Maricopa: Well Rehabilitation, aquifer testing, CAWS
  • Mohave Valley: Well Drilling
  • Munds Park: Septic System Design, Gravity Sewer Design, Assisted in APP Modifications
  • Naco: Water use mitigation study
  • Page: Alternative Septic System Design
  • Palo Verde Elementary School: Upgraded wastewater grinder pumps station controls to reduce/eliminate pump failures that were occurring. Well rehabilitation and potable water system improvements.
  • Parks: Production Well to 3,580 feet
  • Payson: Production Well Drilling, Aquifer testing, CSAMT Survey, Flume installation, reuse master plan, Town Lake pump station design for reclaimed effluent
  • Pinetop: Preliminary Hydrogeologic Investigation
  • Prescott: Hydrogeologic investigation, exploratory drilling, aquifer testing , currently working on the Copper Basin Tank site and the Sierra Vista booster station
  • Prescott Valley: Water Rights investigation, design modifications to wastewater treatment plant, lift station, and force main design, provided ADEQ plant closure permitting for two separate wastewater treatment plants.
  • Queen Creek: CAWS, Aquifer testing, wet infrastructure due diligence services
  • Rio Verde: Upgraded a water system to meet public water supply requirements and corrected septic system problems found during the investigative stage
  • Ruth Fisher: WWTP design and construction, Compliance Sampling, Design build Well Rehabilitation, Soil Borings, Monitoring Well Drilling
  • Scottsdale: Soil borings, Phase I
  • Sierra Vista: Production well drilling, WWTP design and construction services, Recharge facility investigation-design-permitting-CM, aquifer testing, Phase I, Water Reports, AWS, GW/SW litigation support, pretreatment regulations, plant one closure plan and permitting, low pressure interceptor sewer design.
  • South Tucson/Green Valley: Hydrogeologic investigation, wet utility due diligence
  • Stanfield: Three separate septic systems for the school district.
  • Sunset Point Rest Area: Project for ADOT to upgrade electrical controls.
  • Surprise (north): Production well Drilling, Aquifer testing, Gravity survey, reuse master planning, AAWS, well siting analysis
  • Surprise: Production well drilling, exploratory well drilling, Aquifer testing, AAWS, Water master plan
  • Tucson: flood litigation support, environmental work
  • West Valley: Production well drilling, aquifer testing, AAWS, water system analysis
  • White Hills: Assured Water supply, groundwater modeling, preliminary water master planning
  • Why: Well drilling specification currently in progress