Projects

Fluid Solutions has experience working on water, wastewater, environmental, and engineering projects in all three of Arizona's physiographic provinces: the Basin and Range, Transition Zone, and the Colorado Plateau.

Select or hover on our logos around the state to read about our project work completed in those areas, or visit our project description page

 Mouse Over Logos for Project Information Page: Alternative Septic System Design Munds Park: Septic System Design, Gravity Sewer Design, Assisted in APP Modifications Payson: Production Well Drilling, Aquifer testing, CSAMT Survey, Flume installation, reuse master plan, Town Lake pump station design for reclaimed effluent Pinetop: Preliminary Hydrogeologic InvestigationBuckeye: Production well drilling, exploratory well drilling, Recovery Well Permitting, aquifer test, AAWS, CAWS, water master plan, storage tank, booster station, water line installation, technical review of proposed Town well standards, water master plan, technical review of the brine stream disposal alternatives generated from membrane water treatment. Cerro Montoso: Hydrogeologic Analysis, Well Drilling Oversight Alpine: AAWS, utility and water supply analysis at the Alpine Country ClubCasa Grande: AAWS, Aquifer testingArizona City: AAWS Prescott: Hydrogeologic investigation, exploratory drilling, aquifer testing , currently working on the Copper Basin Tank site and the Sierra Vista booster station